Editorial
City and subways can’t catch a break
Twice in six days, Manhattan saw two massive water main breaks that not only
impacted nearby apartments and businesses, but also the lifeblood of the city — our
subway system.
The Jan. 13 burst near Columbus Circle, occurring at the height of the Monday
morning commute, left much of the area without the 1, 2 and 3 subway lines for
most of the day as MTA crews scrambled to pump out the water that poured into
the tunnels. Amazingly, they got the job done just in time for the afternoon rush.
In many ways, the MTA and city were fortunate that the second break occurred
on a sleepy, post-snowstorm Sunday morning near Central Park West and 102nd
Street. That ruptured pipe forced water into the underground tunnel where the
A, C and E trains run.
Yet again, the MTA hustled to get the trains running by the afternoon. However,
the authority stated its frustration with the city over the latest water main break,
claiming that Department of Environmental Protection (DEP) workers only shut
the faulty pipe down an hour after the failure happened.
“We hope this latest incident will spur quicker shut-off response times by the
city and a review of its aging system in hopes of avoiding similar situations moving
forward,” said MTA New York City Transit Vice President Sally Librera on Sunday.
It’s rare that the MTA is the one voicing outrage; usually, the authority is the
one to hear it from commuters and the city. But the MTA’s gripe with the city is
warranted.
When we asked for comment from the DEP about the MTA’s statement, an agency
spokesperson responded with boiler-plate statistics about the frequency of water
main failures in the city, and how much the city is investing toward upgrading the
underground infrastructure.
That information is appreciated, but it doesn’t directly address why crews took an
hour to stop water from pouring out of the busted main Sunday — or what’s being
done to, at the very least, shore up or replace aging water lines near the subways.
We’re told by the DEP that it invests $400 million a year to build about 52 miles
of new mains a year. It’s not nearly enough.
Can’t the city, out of a projected annual budget approaching $100 billion, find the
cash to at least double that effort and keep both the water and the trains running?
The Jan. 7, 1960 issue of The Villager included a photo of Eleanor Roosevelt
and Dr. Edwin S. Burdell, president of The Cooper Union. The
caption said that Burdell was escorting “Mrs. Franklin D. Roosevelt”
through an exhibition of photographs of the Lower East Side, which was on
view in the Cooper Union Museum at Fourth Avenue and 7th Street. The
exhibition was sponsored by the Lower East Side Neighborhood Association
and included 200 photographs by 50 photographers.
Publisher of The Villager, Villager Express, Chelsea Now,
Downtown Express and Manhattan Express
PRESIDENT & PUBLISHER
CEO & CO-PUBLISHER
EDITOR IN CHIEF
REPORTERS
CONTRIBUTORS
ART DIRECTORS
ADVERTISING
ACCOUNT EXECUTIVES
PUBLISHER’S LIABILITY FOR ERROR
The Publisher shall not be liable for slight changes
or typographical errors that do not lessen the value
of an advertisement. The publisher’s liability for
others errors or omissions in connection with an
advertisement is strictly limited to publication of the
advertisement in any subsequent issue.
Published by Schneps Media
One Metrotech North, 3rd floor
Brooklyn, NY 11201
Phone: (718) 260-2500
Fax: (212) 229-2790
On-line: www.thevillager.com
E-mail: news@thevillager.com
© 2019 Schneps Media
VICTORIA SCHNEPS-YUNIS
JOSHUA SCHNEPS
ROBERT POZARYCKI
GABE HERMAN
ALEJANDRA O’CONNELL
MARK HALLUM
MICHELE HERMAN
BOB KRASNER
TEQUILA MINSKY
MARY REINHOLZ
PAUL SCHINDLER
MARCOS RAMOS
CLIFFORD LUSTER
(718) 260-2504
CLUSTER@CNGLOCAL.COM
GAYLE GREENBURG
JIM STEELE
JULIO TUMBACO
ELIZABETH POLLY
New York Press Association
Member of the National
Newspaper Association
Member of the
Member of the
Minority Women Business Enterprise
12 January 23, 2020 Schneps Media
/www.thevillager.com
link
link
/www.thevillager.com
link
link